2013

Michigan/Washington Avenue -
This work was bid out by the Michigan Dept. of Transportation and involved: Full Depth Concrete Pavement at the Matt Urban Drive intersection, Full Depth Concrete Pavement at the 32nd St Intersection and 150 feet west, east and north, Concrete Whitetopping between Matt Urban Dr.and 32nd St.,  Milling and Asphalt Resurfacing between 32nd St. and 27th St., some storm sewer replacement work, some water main crossings replacements, ADA sidewalk ramps, pavement markings, and some curb & gutter work & sidewalk repairs. 
Construction Limits -
Michigan Avenue from 27th Street to 32nd Street
Washington Avenue from 32nd Street to south of Matt Urban Drive
Contractor, Ajax Paving Industries, 248.388.5598
SubContractor, Al's Excavating, 616-405-2422                        
 

E. 24th Street- Lincoln to US-31-  
This was a combined Holland Board of Public Works and City of Holland project to rehabilitate East 24th Street between Lincoln Ave. and US-31.  Work included replacing much of the water main, curb & gutter work, ADA sidewalk ramps, asphalt milling and resurfacing, and pavement markings..

http://www.hollandbpw.com/Construction_Updates/Pages/Home.aspx
Contractor, Ron Meyer & Associates Excavating, Inc